GSE were recently contracted by Conrad Energy to undertake a breakdown repair, following an aftercooler failure, of an in-service 6 Series Jenbacher generator, installed at a STOR power generation site located in Flintshire, North Wales.

Limited access and lifting capacity within the container were considered during initial site assessment and to facilitate the safe removal of the 650Kg aftercooler a custom-made lifting beam was manufactured, and load rated, along with the supply of tested lifting equipment. To enable sufficient clearance to allowing removal of the cooler, the charge air inlet manifold, turbocharger, and plate cooler pipework had to be removed, prior to slinging the cooler core from the container compartment. An external lifting frame was also constructed outside of the container, allowing the cooler to be fleeted onto transport for a workshop repair at a specialist approved supplier.

Featured

Case Studies

Please take a look at some of the varied engineering work we have done across the martime, industrial, locomotive and green energy industries.
Client:

Port Authorities of Trinidad & Tobago

Industry:

Maritime

Find Out More
Client:

Bay Ferries Management Ltd

Industry:

Maritime

Find Out More
Client:

Railway Vehicle Engineering Ltd

Industry:

Locomotive

Find Out More

Interested in working with us?

If you would like further information on any of our services or if you would like to talk with us about a specific project, then...

Get in touch +44 (0)151 604 0990